logo

SH 130 (Segments 5-6)

Sector: Commercial • Location: Texas Metropolitan Area, United States of America

Source: Federal Highway Administration (FHWA)

Project
Close

SH 130 is a four-lane, 91-mile toll road east and south of Austin designed to relieve congestion on the heavily traveled I-35, the primary north-south route through Central Texas. Segments 1-4 of SH 130 (which are part of the Central Texas Turnpike System that includes SH 45 North and Loop 1) were constructed as a separate project and opened in stages between November

Project Information FAQ

Project Information

5 Q
The project “SH 130 (Segments 5-6)” is an infrastructure initiative in the Commercial sector, located in Texas Metropolitan Area, United States of America. Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

SH 130 is a four-lane, 91-mile toll road east and south of Austin designed to relieve congestion on the heavily traveled I-35, the primary north-south route through Central Texas. Segments 1-4 of SH 130 (which are part of the Central Texas Turnpike System that includes SH 45 North and Loop 1) were constructed as a separate project and opened in stages between November 2006 and April 2008. On March 22, 2007, TxDOT signed a Comprehensive Development Agreement (CDA) with the SH 130 Concession Company to design, build, finance, operate, and maintain a 40-mile extension of SH 130 (Segments 5 and 6) under a 50-year concession from the date of opening. The project opened to traffic on October 24, 2012 and service commenced on November 11, 2012. The extension follows the current US 183 alignment from north of Mustang Ridge to north of Lockhart and extends southwest to I-10 northeast of Seguin.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data