SH 45SW is a four-lane toll road under development by the Central Texas Regional Mobility Authority between the southern end of MoPac Expressway (Loop 1) and FM 1626 southwest of Austin, Texas near the border of Travis and Hays Counties. The four-mile limited-access route will have four access and egress points. The project is expected to relieve growing congestion on local roads (Manchaca Road, S

Project Information FAQ

Project Information

5 Q
The project “SH 45SW” is an infrastructure initiative in the Commercial sector, located in Texas, United States of America. Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

SH 45SW is a four-lane toll road under development by the Central Texas Regional Mobility Authority between the southern end of MoPac Expressway (Loop 1) and FM 1626 southwest of Austin, Texas near the border of Travis and Hays Counties. The four-mile limited-access route will have four access and egress points. The project is expected to relieve growing congestion on local roads (Manchaca Road, Slaughter Lane, Brodie Lane) used by commuters to access MoPac Expressway and downtown Austin. An environmental study conducted by the Texas Department of Transportation in 2013 identified the SH 45SW corridor along state-owned right-of-way as the preferred solution to this problem. Early planning for a larger circumferential roadway that would have contained SH 45SW as one part began in the mid-1980s. A lawsuit filed after the release of the environmental review for the project resulted in a court decision specifying that only state funds could be used to build the facility. Accordingly, project financing is expected to include state funds and a loan from the Texas Mobility Fund and contributions from Travis and Hays Counties. No federal funding will be used. Drivers who use SH 45SW to access Austin's downtown core are expected to save 9 to 17 minutes over current travel times. Those who continue to use local roads for those same trips are expected to save 6 to 7 minutes. The project is expected to open in 2019.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data