SH1 Russley Road Upgrade, Christchurch, New Zealand

Sector: Airport • Location: World

Source: Road Traffic Technology

Project
Closed

SH1 Russley Road between Wairekei Road and Yaldhurst Road is being upgraded at a cost of $112m. Credit: NZ Transport Agency. The project added a signalised intersection at Memorial Avenue to improve safety for pedestrians and cyclists. Credit: NZ Transport Agency. Construction on the SH1 Russley Road upgrade commenced in 2016. Credit: NZ Transport Agency. The upgrade will add pedestrian crossings

Project Information FAQ

Project Information

5 Q
The project “SH1 Russley Road Upgrade, Christchurch, New Zealand” is an infrastructure initiative in the Airport sector, located in World. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

SH1 Russley Road between Wairekei Road and Yaldhurst Road is being upgraded at a cost of $112m. Credit: NZ Transport Agency. The project added a signalised intersection at Memorial Avenue to improve safety for pedestrians and cyclists. Credit: NZ Transport Agency. Construction on the SH1 Russley Road upgrade commenced in 2016. Credit: NZ Transport Agency. The upgrade will add pedestrian crossings and cycle facilities. Credit: NZ Transport Agency. The State Highway 1 (SH1) Russley Road upgrade project will widen 3.5km of the existing two-lane section of the highway between Wairakei Road and Yaldhurst Road in Christchurch, New Zealand, into a four-lane median separated expressway. The SHI runs between Belfast in the north to the large industrial area at Hornby in the south and connects the northern and southern Canterbury areas with Christchurch International Airport. The upgrade is being undertaken by NZ Transport Agency at an estimated cost of $112m, as part of the Christchurch Western Corridor programme. Construction on the project started in 2016 and is expected to be completed by April 2018. The upgraded four-lane highway will improve road safety, reduce traffic and ensure predictable travel times at the intersection of Memorial Avenue and Christchurch Airport. It will also support economic growth and provide new job opportunities. Upgrade works on the project have been divided into four zones, namely Harewood Road roundabout, Wairakei Road/Russley Road intersection, Russley Road (SH1)/Memorial Avenue interchange and Southern Airport Access. The Harewood Road roundabout will be replaced with a larger diameter roundabout and a 150m subway will be built at Orchard Road. An additional lane for vehicles turning left towards Russley Road from the airport side of Harewood Road will also be built. The project will reduce user access to the Wairakei Road/Russley Road intersection as it is located too close to the end of the Russley/Memorial interchange slip lanes. The existing Russley/Memorial roundabout, which is one of the riskiest interchanges in the country and a major congestion point on the highway, is being replaced with a grade-separated interchange with the SH1 going over Memorial Avenue overbridge and the Memorial Avenue road being moved under the bridge. A third access point to the airport will be created south of Avonhead Road under the third zone of the project to improve freight access. The access point will separate heavy freight traffic from passenger traffic allowing safe and efficient functioning of the airport precinct. The Memorial Avenue overbridge has been designed as a gateway to Christchurch and is inspired by the local landscape and the Southern Alps. It includes two steel arches weighing 400t and installed with four knuckles, which are vital parts of the structure and create the lower curves and intersections for the arches. The knuckles also connect the arches with 12 supporting piles installed approximately 20m underground. The final piece of the bridge or the arch cap, weighing 13.5t, was put in place with the help of a 180t crane in July 2017. The bridge was opened to traffic in November 2017, although final road surface works and other works related to the upgrade project are still ongoing. The project will create pedestrian crossings and cycle lanes at the signalised intersection of Memorial Avenue. A 2.5m-wide paved shoulder will also be created on either side of the highway to accommodate cyclists. A subway for pedestrians and cyclists will also be built under the Harewood Roundabout, providing a safe access point to the airport precinct and the McLean’s Island area across the SH1. McConnell Dowell and Downer joint venture (JV) was contracted to construct the upgrade project. Jasmax and AECOM were appointed as the architects. The Memorial Avenue Bridge was designed by a team comprising Portal–Boffa Miskell, Warren and Mahoney, Holmes Consulting Group and Traffic Design Group.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data