Shaanxi Dali Waste-to-Energy Plant
Active · China
Source: World Bank Group
The project entails the construction of a waste-to-energy plant at Dali in Shaanxi Province. The facility will have a waste processing capacity of 400 tonnes per day. It will be built on a build-operate-transfer (BOT) basis with a concession period of at least 30 years. Sponsor of the project is China Everbright International. Total investment stands at $41.13 million. Acucomm files
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Biomass, Government, Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Shaanxi Dali Waste-to-Energy Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the construction of a waste-to-energy plant at Dali in Shaanxi Province. The facility will have a waste processing capacity of 400 tonnes per day. It will be built on a build-operate-transfer (BOT) basis with a concession period of at least 30 years. Sponsor of the project is China Everbright International. Total investment stands at $41.13 million. Acucomm files |
Original sector | Municipal Solid Waste |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Biomass, Government, Commercial |
Article published date | 2024-09-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
