logo
ProjectGc Bidding-Invitation

Shakeys Pico Rivera

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

UPGRADE EXTERIOR FINISHES. MINOR NON-STRUCTURAL INTERIOR RENOVATIONS THAT INCLUDE NEW FINISHES, LIGHT FIXTURES AND MECHANICAL WORK. THERE IS NO CHANGE TO THE BUILDING'S USE, OCCUPANCY, HEIGHT, AREA OR PARKING. PARKING IS CURRENTLY BEING SHARED AMONGST THE PLAZA. SEISMIC GAS SHUTOFF VALVE IS REQUIRED FOR NEW CONSTRUCTION AND EXISTING CONSTRUCTION WITH A PERMIT OVER 10,000.00 PER 1208.13.1, CCMC 15.

Status
Prospective
Sector
Consumer Products, Raw Materials, Car parking, Automotive, Commercial
Location
Pico Rivera, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Shakeys Pico Rivera

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Shakeys Pico Rivera” is an infrastructure initiative in the Consumer Products sector, located in Pico Rivera, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

GC Bidding-Invitation

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

UPGRADE EXTERIOR FINISHES. MINOR NON-STRUCTURAL INTERIOR RENOVATIONS THAT INCLUDE NEW FINISHES, LIGHT FIXTURES AND MECHANICAL WORK. THERE IS NO CHANGE TO THE BUILDING'S USE, OCCUPANCY, HEIGHT, AREA OR PARKING. PARKING IS CURRENTLY BEING SHARED AMONGST THE PLAZA. SEISMIC GAS SHUTOFF VALVE IS REQUIRED FOR NEW CONSTRUCTION AND EXISTING CONSTRUCTION WITH A PERMIT OVER 10,000.00 PER 1208.13.1, CCMC 15.02.130 PROJECT VALUATION IS $105,000.00

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Pico Rivera

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Consumer Products, Raw Materials, Car parking, Automotive, Commercial

Article published date

2024-12-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project