Shambu ki Burj-2 Solar Project
Sector: Power Generation (CCGT) • Location: Bikaner, Rajasthan, India
Source: The Week
The 300 MW Shambu ki Burj-2 Solar PV Project has been made fully operational by NTPC Green Energy (NGEL), with the final capacity of 18.32 MW now supplying electricity. This project contributes to the total installed capacity of the NTPC group, which has reached 77,411.50 MW.
- Status
- Closed
- Sector
- Power Generation (CCGT), Solar
- Location
- Bikaner, Rajasthan, India
- Updated
- 22 Jul 2026
- Source
- The Week
ConstructChat
Ask ConstructChat about Shambu ki Burj-2 Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 300 MW Shambu ki Burj-2 Solar PV Project has been made fully operational by NTPC Green Energy (NGEL), with the final capacity of 18.32 MW now supplying electricity. This project contributes to the total installed capacity of the NTPC group, which has reached 77,411.50 MW. |
Original sector | Energy |
Location
Country | India |
State | Rajasthan |
City | Bikaner |
Source
Source | The Week |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar |
Article published date | 2025-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
