Shandong Flue Gas Desulfurization
Sector: Power Generation (CCGT) • Location: China
Source: World Bank Group
The objective of the Shandong Power Plant Flue Gas Desulfurization Project for China is to reduce Sulfur Dioxide (SO2) emissions in the heat and power sector and enhance the capacity of regulatory authorities to monitor and enforce compliance with their SO2 emissions reduction program. There are two components to the project. The first component is the technical assistance component. To strengthen
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The objective of the Shandong Power Plant Flue Gas Desulfurization Project for China is to reduce Sulfur Dioxide (SO2) emissions in the heat and power sector and enhance the capacity of regulatory authorities to monitor and enforce compliance with their SO2 emissions reduction program. There are two components to the project. The first component is the technical assistance component. To strengthen the technical and institutional capacity related to SO2 emission control and reduction in Shandong, it includes: (i) capacity building and enhancement in emission monitoring and regulation enforcement, including upgrading of online monitoring equipment and information systems; and (ii) technical and managerial training; and (iii) development of related regulations, procedures, and policies. Finally, the second component is the investment component to finance the installation of Flue Gas Desulfurization (FGD) facilities at four coals fired heat and power plants. These plants include existing coal-fired cogeneration units and cogeneration units that are under construction or planned for construction. All plants have selected to install limestone-gypsum wet FGD technology. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
