Shandong Pingdu Waste-to-energy Plant Phase II
Active · China
Source: World Bank Group
The project involves the construction of phase II of Shandong Pingdu Waste-to-energy Project, located in Pingdu City, Shandong province of China. The 2nd phase of project has a designed daily household waste processing capacity of 300 tonnes (109,500 tonnes/year). The 2nd phase of plant will be equipped with one 300 tonnes/day grate furnace and one set of 6 MW turbine power generator. Phase I and
- Status
- Prospective
- Sector
- Government, Waste Processing and Treatment, Biomass, Wind, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Shandong Pingdu Waste-to-energy Plant Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of phase II of Shandong Pingdu Waste-to-energy Project, located in Pingdu City, Shandong province of China. The 2nd phase of project has a designed daily household waste processing capacity of 300 tonnes (109,500 tonnes/year). The 2nd phase of plant will be equipped with one 300 tonnes/day grate furnace and one set of 6 MW turbine power generator. Phase I and phase II of Pingdu Project will reach the designed daily waste processing capacity of 900 tonnes and the plant is expected to generate green electricity of around 98 million kWh per year. The sponsor China Everbright international Ltd signed a concession agreement under BOT (Build-Operate-Transfer) model. The project cost is approximately CNY 150 million or $ 22.32 million. Financial close was reached on 31 January 2019. https://www.ebchinaintl.com/en/media/news_content-p190131.html |
Original sector | Municipal Solid Waste |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Government, Waste Processing and Treatment, Biomass, Wind, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
