logo

Shandong Pingdu Waste-to-energy Plant Phase II

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

The project involves the construction of phase II of Shandong Pingdu Waste-to-energy Project, located in Pingdu City, Shandong province of China. The 2nd phase of project has a designed daily household waste processing capacity of 300 tonnes (109,500 tonnes/year). The 2nd phase of plant will be equipped with one 300 tonnes/day grate furnace and one set of 6 MW turbine power generator. Phase I and

Status
Prospective
Sector
Biomass, Wind, Commercial, Government, Power Generation (CCGT), Waste Processing and Treatment, Manufacturing (Industrial), Water Supply and Storage
Location
Shandong, China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Shandong Pingdu Waste-to-energy Plant Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Shandong Pingdu Waste-to-energy Plant Phase II” is an infrastructure initiative in the Biomass sector, located in Shandong, China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the construction of phase II of Shandong Pingdu Waste-to-energy Project, located in Pingdu City, Shandong province of China. The 2nd phase of project has a designed daily household waste processing capacity of 300 tonnes (109,500 tonnes/year). The 2nd phase of plant will be equipped with one 300 tonnes/day grate furnace and one set of 6 MW turbine power generator. Phase I and phase II of Pingdu Project will reach the designed daily waste processing capacity of 900 tonnes and the plant is expected to generate green electricity of around 98 million kWh per year. The sponsor China Everbright international Ltd signed a concession agreement under BOT (Build-Operate-Transfer) model. The project cost is approximately CNY 150 million or $ 22.32 million. Financial close was reached on 31 January 2019. https://www.ebchinaintl.com/en/media/news_content-p190131.html

Original sector

Municipal Solid Waste

Procurement method

Budget

Location

Country

China

State

Shandong

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Wind, Commercial, Government, Power Generation (CCGT), Waste Processing and Treatment, Manufacturing (Industrial), Water Supply and Storage

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project