logo

Shandong Qingdao Jiaozhou Integrated Solid Waste Treatment Phase I

Sector: Biomass • Location: China

Source: World Bank Group

Project
Active

The project involves the development of the first phase of the Shandong Qingdao Jiaozhou Integrated Solid Waste Treatment project in China. The project will cover the integrated treatment of household waste, food waste, municipal sludge, fly ash and incineration residue for Jiaozhou City and its rural area. It is designed to have a daily household waste processing capacity of 1,200 tonnes, a dail

Status
Prospective
Sector
Biomass, Wind, Government, Power Generation (CCGT), Waste Processing and Treatment, Manufacturing (Industrial), Water Supply and Storage
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Shandong Qingdao Jiaozhou Integrated Solid Waste Treatment Phase I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Shandong Qingdao Jiaozhou Integrated Solid Waste Treatment Phase I” is an infrastructure initiative in the Biomass sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the development of the first phase of the Shandong Qingdao Jiaozhou Integrated Solid Waste Treatment project in China. The project will cover the integrated treatment of household waste, food waste, municipal sludge, fly ash and incineration residue for Jiaozhou City and its rural area. It is designed to have a daily household waste processing capacity of 1,200 tonnes, a daily food waste processing capacity of 100 tonnes, and a daily municipal sludge processing capacity of 200 tonnes and will be equipped with two 600 tonnes/day mechanical grate furnaces and a 25MW turbine power generator. The Invest-Construct-Operate concession has a period of 30 years including construction period. Sponsor is China Everbright Environment Group Limited and the total value is $121.75 million (RMB867 million). According to the concession agreement, the project company's receipt of renewable energy subsidies will be linked to the waste treatment service fee adjustment mechanism to ensure reasonable return of the project. https://www.cebenvironment.com/en/media/news_content-p220112.html

Original sector

Municipal Solid Waste

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Wind, Government, Power Generation (CCGT), Waste Processing and Treatment, Manufacturing (Industrial), Water Supply and Storage

Article published date

2024-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project