logo

Shandong Qingdao Zhangcun River Waste Water Treatment Plant Phase I and II Upgrading Project

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

"The project comprises the securing of a concession agreement for the upgrade and operation of Zhangcun River Waste Water Treatment Plant (“Qingdao Zhangcun River Plant”) Phase I and II. The sponsor is a consortium, lead by China Everbright Water Limited. It signed a concession agreement of March 13, 2024, with an investment of approximately $95.79m or RMB688 million. The concession period is 30 y

Project Information FAQ

Project Information

4 Q
The project “Shandong Qingdao Zhangcun River Waste Water Treatment Plant Phase I and II Upgrading Project” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

"The project comprises the securing of a concession agreement for the upgrade and operation of Zhangcun River Waste Water Treatment Plant (“Qingdao Zhangcun River Plant”) Phase I and II. The sponsor is a consortium, lead by China Everbright Water Limited. It signed a concession agreement of March 13, 2024, with an investment of approximately $95.79m or RMB688 million. The concession period is 30 years (inclusive of a construction period). The project will be invested in, constructed, operated and maintained based on the BOT (Build-Operate-Transfer) model by a project company to be incorporated by the Consortium, in which Everbright Water holds a 49% equity interest. The other sponsor is Qingdao Environmental Energy, holding respectively 51%. The construction work designed a daily waste water treatment of 60,000 m3 for phase II and daily waste water treatment of 40,000 m3 for phase I. The effluent after treatment will be disinfected and used to replenish the water of Zhangcun River. The implementation of Qingdao Zhangcun River Project will further improve the municipal waste water collection and treatment system in Zhangcun River coverage area, and meet the increasing demand for waste water treatment in the local region. " https://www.ebwater.com/en/media/press_each.php?file=p240313 ; https://www1.hkexnews.hk/listedco/listconews/sehk/2024/0523/2024052301075.pdf https://www.ebwater.com/en/media/press_each.php?file=p240313 ; https://www1.hkexnews.hk/listedco/listconews/sehk/2024/0523/2024052301075.pdf

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data