Shandong Rizhao Industrial Solid Waste Integrated Treatment Project
The owner, status and timeline of this project. A free account opens every field.
Source: InfraPPPWorld
The project involves the development of a waste treatment facility in Rizhao City, in Shangdong province, eastern China. It will be constructed in two phases. The project phase I will have an annual incineration processing capacity of 30,000 tonnes and an annual physical-chemical treatment capacity of 20,000 tonnes. It will mainly process hazardous waste and industrial solid waste from Rizhao City
- Status
- Closed
- Sector
- Biomass, Chemical (Industrial), Waste Processing and Treatment, Manufacturing (Industrial), Water Supply and Storage
- Location
- China
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Shandong Rizhao Industrial Solid Waste Integrated Treatment Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the development of a waste treatment facility in Rizhao City, in Shangdong province, eastern China. It will be constructed in two phases. The project phase I will have an annual incineration processing capacity of 30,000 tonnes and an annual physical-chemical treatment capacity of 20,000 tonnes. It will mainly process hazardous waste and industrial solid waste from Rizhao City and its surrounding areas. The project phase I will be constructed on a build-operate-own model, with a concession period of no less than 30 years. |
Original sector | Water & Waste |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Biomass, Chemical (Industrial), Waste Processing and Treatment, Manufacturing (Industrial), Water Supply and Storage |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Biomass projects in China
- Yumen City 30MW Biomass Power Plant Project
- Fumeng County Biomass Power Plant
- Canvest Chinese Waste-to-Energy Portfolio II
- Eco-Industrial Park Waste-to-Energy portfolio
- Chengdu Wanxing Green Power Plant
- Xiqing Food Waste Treatment Plant
- Junan County Solid Waste Incineration Power Plant
- Henan Zhecheng Waste-to-Energy Project
