logo

Shandong Xiajin Waste-to-energy Plant Phase I

Sector: Biomass • Location: China

Source: World Bank Group

Project
Active

The project involves the development, construction and operation of phase I of Shandong Xiajin Waste-to-energy Plant, located in Xiajin, Shandong Province of China. The project will be designed with a daily household waste processing capacity of 900 tonnes and will be constructed in two phases. Phase I will have a capacity of 600 tonnes/day (219,000 tonnes/year). It will be equipped with 2 x 300 t

Status
Prospective
Sector
Biomass, Wind, Government, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Manufacturing (Industrial), Water Supply and Storage
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Shandong Xiajin Waste-to-energy Plant Phase I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Shandong Xiajin Waste-to-energy Plant Phase I” is an infrastructure initiative in the Biomass sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the development, construction and operation of phase I of Shandong Xiajin Waste-to-energy Plant, located in Xiajin, Shandong Province of China. The project will be designed with a daily household waste processing capacity of 900 tonnes and will be constructed in two phases. Phase I will have a capacity of 600 tonnes/day (219,000 tonnes/year). It will be equipped with 2 x 300 tonnes/day grate furnace and a 15MW turbine power generator. It is expected to generate on-grid electricity of 84 million kWh annually. China Everbright International Ltd is the sponsor. The concession agreement is for a period of 30 years, which includes the construction period. The project cost is approximately CNY 382 million or $ 53.4 million. Financial close was reached on 3 October 2019. https://www.ebchinaintl.com/en/media/news_content-p191003.html

Original sector

Municipal Solid Waste

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Wind, Government, Power Generation (CCGT), Waste Processing and Treatment, Commercial, Manufacturing (Industrial), Water Supply and Storage

Article published date

2024-05-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project