Shandong Zhucheng Waste-to-energy Plant Phase I
Sector: Wind • Location: China
Source: World Bank Group
The project involves the development, construction and operation of phase I of Shandong Zhucheng Waste-to-energy Plant, located in Zhucheng, Shandong Province of China. The project will be designed with a daily household waste processing capacity of 1,000 tonnes and will be constructed in two phases. Phase I will have a capacity of 500 tonnes/day (182,500 tonnes/year). It will be equipped with a 5
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves the development, construction and operation of phase I of Shandong Zhucheng Waste-to-energy Plant, located in Zhucheng, Shandong Province of China. The project will be designed with a daily household waste processing capacity of 1,000 tonnes and will be constructed in two phases. Phase I will have a capacity of 500 tonnes/day (182,500 tonnes/year). It will be equipped with a 500 tonnes/day grate furnace and a 12MW turbine power generator. It is expected to generate on-grid electricity of 74 million kWh annually. China Everbright International Ltd is one of the sponsors with an 80% stake. The other(s) is/are not disclosed. The concession agreement on a BOT (Build-Operate-Transfer) basis is for a period of 30 years, which includes the construction period. The project cost is approximately CNY 374 million or $ 52.3 million. Financial close was reached on 3 October 2019. https://www.ebchinaintl.com/en/media/news_content-p191003.html |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
