Shannon Wind Clay County Wind Project
Sector: Power Generation (CCGT) • Location: Texas, United States
Source: Bondoro
Shannon Wind’s Chapter 11 plan contemplates a dual-track process for its 204.1-megawatt Clay County, Texas wind project involving either a sale of all or substantially all assets or acquisition of 100% of the reorganized debtor’s new equity, with estimated prepetition secured obligations of approximately $117.6 million.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Wind
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Bondoro
ConstructChat
Ask ConstructChat about Shannon Wind Clay County Wind Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under restructuring |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Shannon Wind’s Chapter 11 plan contemplates a dual-track process for its 204.1-megawatt Clay County, Texas wind project involving either a sale of all or substantially all assets or acquisition of 100% of the reorganized debtor’s new equity, with estimated prepetition secured obligations of approximately $117.6 million. |
Original sector | Renewable Energy |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Bondoro |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind |
Article published date | 2026-04-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States
- EPC of Turbine and Foundation Structure in the Southwest Sea Wind Power Demonstration Complex
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Tampa Bay Seawater Desalination Plant
- Carlsbad Desalination Project, San Diego, California
- Joint Base Lewis-McChord
- Fort Benning, Georgia
- Naval Base San Diego, California
- Dover Air Force Base
