Shanshui III
Sector: Power Generation (CCGT) • Location: China
Source: International Finance Corporation (IFC)
SSG is China’s second largest cement manufacturing groups, and the market leader in the Shandong Province. With headquarters in Shandong Province, SSG operates 10 clinker manufacturing lines at seven locations, with a total installed capacity of 12.4 million tons of clinker per year, and 46 clinker milling and cement bagging facilities at 13 locations (of which one is under construction). SSG ha
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | SSG is China’s second largest cement manufacturing groups, and the market leader in the Shandong Province. With headquarters in Shandong Province, SSG operates 10 clinker manufacturing lines at seven locations, with a total installed capacity of 12.4 million tons of clinker per year, and 46 clinker milling and cement bagging facilities at 13 locations (of which one is under construction). SSG has reached its current capacity through a combination of acquiring existing cement manufacturing plants and converting them to modern dry-kiln operations and establishing greenfield operations in connection with sustainable limestone deposits. IFC is considering a second combined equity and debt financing package for SSG’s corporate operations that would include the acquisition and upgrading of four existing cement production facilities and the construction of two new greenfield facilities. The upgrading of acquired facilities will both include emission control upgrades, installation of energy efficient equipment, and the installation of the latest waste heat recovery systems for power generation. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
