Shantou Chaoyang Power Plant

Sector: Commercial • Location: China

Source: World Bank Group

Project
Concluded

Shantou Chaoyang Plant is a 90-MW oil-fired power plant comprising five 1-MW and eight 9.5-MW diesel generators. It is owned and operated by the Shantou Changchao Power Development Co. Ltd., a Sino-foreign cooperative joint venture. The joint venture was established in October 25, 1993 by Shantou Municipal Power Development Company, a PRC state-owned enterprise and Cheung Kong Hutchison Changchao

Status
Closed
Sector
Commercial, Power Generation (CCGT), Government, Oil and Gas
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Shantou Chaoyang Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Shantou Chaoyang Power Plant” is an infrastructure initiative in the Commercial sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

concluded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Shantou Chaoyang Plant is a 90-MW oil-fired power plant comprising five 1-MW and eight 9.5-MW diesel generators. It is owned and operated by the Shantou Changchao Power Development Co. Ltd., a Sino-foreign cooperative joint venture. The joint venture was established in October 25, 1993 by Shantou Municipal Power Development Company, a PRC state-owned enterprise and Cheung Kong Hutchison Changchao Power Ltd, a subsidiary of Cheung Kong Infrastructure. CKI disposed of its share in the project in 2002. The plant occupies a land area of 59,300 sq. meters, which is leased from the municipality for the joint venture term. The total project costs approximately $50 million. CKH Changhchao invested 60% of the equity in cash in US dollars, while Shantou Power Development Invested 40% of the equity as an asset contribution consisting of diesel generators, buildings and facilities. The joint venture was formed to build and operate the power plant until December 31, 2010. Upon expiration, the fixed assets of the plant as well as all US dollars in the reserve fund will belong to Shantou Power Development. Current plant assets will be distributed to the joint venture parties in accordance with their initial actual investment ratio. If the CKH Changchao fails to recoup its investment, the municipality company will make up for the short-fall. The joint venture has entered into a long term power purchase contract coterminuous with the joint-venture agreement. To secure the joint venture parties' recoupment of and return on investment, Shantou Power company has agreed to purchase all electricity generated by the plant and guarantees to offtake certain annual minimum quantities. The minimum offtake quantities for the years 1995 and 1996 were 366.7KWh and 331.7KWh, respectively. There is no operations and management contract and Shantou Power Development is responsible for fuel supply, maintaining all power generators and anciliary facilities of Chaoyang Power Plant, and ensuring that the plant can generate sufficient electricity to satisfy the annual minimum quantitities stipulated under the purchase agreement. The BOT period ended in 2010, and all assets were transferred to the government.

Original sector

Energy

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Government, Oil and Gas

Article published date

2024-09-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project