Shared Resources West Water Main
Sector: Water Supply and Storage • Location: Trent, South Dakota, United States of America
Source: Dodge USA
Construction of a 24-inch diameter potable water transmission main from the Shared Resources water treatment facility near Trent, SD to the west reservoir and pumping facilities. The water main construction consists of about 43,000 linear feet of 24-inch PVC water main installed by open excavation and horizontal directional drilling methods, ductile iron fittings and restraints, highway crossings
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Metal, Commercial, Waste Processing and Treatment, Road, Steel
- Location
- Trent, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Shared Resources West Water Main
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a 24-inch diameter potable water transmission main from the Shared Resources water treatment facility near Trent, SD to the west reservoir and pumping facilities. The water main construction consists of about 43,000 linear feet of 24-inch PVC water main installed by open excavation and horizontal directional drilling methods, ductile iron fittings and restraints, highway crossings with jack & bored 36 casing pipe, isolation gate valves, air release valves, sacrificial corrosio... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Trent |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Metal, Commercial, Waste Processing and Treatment, Road, Steel |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
