Sharing and better distributing the capricious waters of the Red River
Sector: Commercial • Location: France
Source: Proparco Groupe AFD (Agence Française de Développement)
The project has a total cost of some EUR 135m and is being financed by the Government, the Asian Development Bank (AsDB) and AFD. It comprises three main components:1. Water Resources University The project is financing part of the first construction phase for a new campus for the Water Resources University (WRU) in the Chuong My District in Hanoi and the overhaul of its teaching based on discipli
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | achevé |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project has a total cost of some EUR 135m and is being financed by the Government, the Asian Development Bank (AsDB) and AFD. It comprises three main components:1. Water Resources University The project is financing part of the first construction phase for a new campus for the Water Resources University (WRU) in the Chuong My District in Hanoi and the overhaul of its teaching based on disciplines that integrate the new challenges facing the country, at the intersection of water and climate change issues. This component is fully financed by the Asian Development Bank and Vietnamese Government. 2. Capacity building for actors in the Bac Hung Hai areaThe project is contributing to building the capacities of water management organizations in the Bac Hung Hai area with the financing of the first phase of a Supervisory Control and Data Acquisition (SCADA) system. The system will be managed centrally by the Hai Duong Irrigation Company, which will thereby be able to measure in real time the level and drainage of water in key places in the system. Furthermore, a pilot operation in Gia Binh District (Bac Ninh Province) is contributing to building/strengthening the capacities of actors at the level of the weakest link (agricultural production cooperatives in villages), as well as to strengthening water management institutions by involving all actors (from the Irrigation Management Company to village cooperatives) in the management of a Local Infrastructure Development Fund (LIDF). Finally, the project is participating in the study conducted by WRU and BRL Engineering on the consequences of climate change in the Red River Delta and the resulting adaptation measures required (communication made at COP 21). AFD is financing, in the form of a grant, the pilot operation in Gia Binh District and the study on the consequences of climate change in the Red River Delta.3. Construction and rehabilitation of water infrastructure in Bac Hung HaiThe project is financing the construction of eight new pumping stations and the rehabilitation of two existing stations. The bulk of the investments concern the drainage of the area, whose total flow after the completion of works will be increased by 135.2 m3/s. The catchment area of the stations to be rehabilitated or created stands at some 49,000 ha. Only one station involves pumping water for irrigation in part of Bac Ninh Province. Some 11,200 ha will benefit from a doubling of the water flow available for irrigation. At an equal irrigation or drainage flow, the project will drain an additional surface area of some 35,000 ha and irrigate an additional surface area of 5,600 ha.AFD’s financing covers the entire cost of the investments planned in Bac Ninh Province and, in order to make the best possible use of the available funds, the cost of an investment in Hai Duong Province and another in Hung Yen Province.Intervenors and operating method:The Ministry of Agriculture and Rural Development is the project contracting authority and is delegating the authority to a Central Project Management Unit in the Central Project Office. The implementing agencies include the Irrigation and Drainage Management Company of Bac Hung Hai, the Provincial People’s Committees and the Departments of Agriculture and Rural Development. A team of consultants, INROS LACKNER AG, recruited to assist the contracting authority and support each project management unit responsible for project management. Progress: 95% of the works have been completed. Three of the five structures have been fully completed, one of which has been operational since 2015 (managed by the Water Structure Management Company of Nam Duong). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |