Sharp Hills Wind Farm DUPLICATE REPORT
Sector: Wind • Location: Alberta, Canada
Source: Dodge USA
248 MW Sharphills wind power plant located in Special Areas 3 and 4 - Will consist of 83 Vestas V136 3.6 MW turbines, turbine foundations, crane pads, an electrical collection system, permanent meteorological towers, an operations and maintenance facility, laydown yards and the Sedalia 363S substation - Connection to 240kV ATCO transmission line 9L46 that bisects project area - Connection to AIES
- Status
- Failure
- Sector
- Wind, Power Generation (CCGT), Raw Materials, Commercial
- Location
- Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sharp Hills Wind Farm DUPLICATE REPORT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | abandoned |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 248 MW Sharphills wind power plant located in Special Areas 3 and 4 - Will consist of 83 Vestas V136 3.6 MW turbines, turbine foundations, crane pads, an electrical collection system, permanent meteorological towers, an operations and maintenance facility, laydown yards and the Sedalia 363S substation - Connection to 240kV ATCO transmission line 9L46 that bisects project area - Connection to AIES |
Budget |
Location
Country | Canada |
State | Alberta |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Raw Materials, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
