logo

Sharq Area Development Project

Sector: Electric Vehicles (EVs) • Location: Kuwait City, Asimah Governorate, Kuwait

Source: Kuwait Times

Project
Under Construction

The Sharq Area Development Project includes the construction of a multistorey car park and a public park over a land area of approximately 12,000 square meters. The car park building consists of a basement, ground floor, and five upper floors, providing about 1,175 parking spaces including spaces for people with special needs and electric vehicle charging. The top floor will be covered with solar

Project Information FAQ

Project Information

5 Q
The project “Sharq Area Development Project” is an infrastructure initiative in the Electric Vehicles (EVs) sector, located in Kuwait City, Asimah Governorate, Kuwait. Taiyo aggregates data on it from Kuwait Times.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Sharq Area Development Project includes the construction of a multistorey car park and a public park over a land area of approximately 12,000 square meters. The car park building consists of a basement, ground floor, and five upper floors, providing about 1,175 parking spaces including spaces for people with special needs and electric vehicle charging. The top floor will be covered with solar panels generating up to 500 megawatts annually. The project also includes green spaces, open squares, and ornamental plantings, utilizing the latest parking design and operation technology. It aims to address the shortage of parking in Kuwait City and improve the surrounding environment. The project is expected to be completed by the end of 2026.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data