Shaw Creek Rest Area Restroom Bldg & Maintenance Garage
Sector: Metal • Location: South Fork, Colorado, United States of America
Source: Dodge
The new rest area building will be a 2,960 gross square foot wood-framed structure with fiber cement siding, stone veneer, and sloped standing-seam metal roofs. The building will contain an entry area with two sets of entry doors, public men s, women s, family restrooms, and vending area; staff office, break room, and restroom, with storage, mechanical and garage spaces. The garage space will be u
- Status
- Prospective
- Sector
- Metal, Automotive, Manufacturing (Industrial), Residential, Car parking, Commercial
- Location
- South Fork, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Shaw Creek Rest Area Restroom Bldg & Maintenance Garage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The new rest area building will be a 2,960 gross square foot wood-framed structure with fiber cement siding, stone veneer, and sloped standing-seam metal roofs. The building will contain an entry area with two sets of entry doors, public men s, women s, family restrooms, and vending area; staff office, break room, and restroom, with storage, mechanical and garage spaces. The garage space will be used to store a pick-up truck with plow, tractor with plow, snow-blowers, mowers, and other mainte... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | South Fork |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Automotive, Manufacturing (Industrial), Residential, Car parking, Commercial |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
