Shaw Road Phase4A Widening Project
Sector: Road • Location: Puyallup, Washington, United States
Source: AOL
The project involves widening Shaw Road to five lanes from 23rd Avenue Southeast North to 12th Avenue Southeast in Puyallup, Washington. The Phase4A segment covers from 25th to 20th Avenue Court East. The project includes additional topographic surveying, wetland and stream delineation, stormwater pond and drainage design, geotechnical investigations, right-of-way support services, and groundwater
- Status
- Prospective
- Sector
- Road
- Location
- Puyallup, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- AOL
ConstructChat
Ask ConstructChat about Shaw Road Phase4A Widening Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | design and engineering |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves widening Shaw Road to five lanes from 23rd Avenue Southeast North to 12th Avenue Southeast in Puyallup, Washington. The Phase4A segment covers from 25th to 20th Avenue Court East. The project includes additional topographic surveying, wetland and stream delineation, stormwater pond and drainage design, geotechnical investigations, right-of-way support services, and groundwater monitoring. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Puyallup |
Source
Source | AOL |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-05-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
