logo

Sheep Bridge/Key Bridge Road Paving Project

Sector: Road • Location: Virgin, Utah, United States

Source: Citizen Portal AI

Project
Planned

Washington County plans to pave Sheep Bridge/Key Bridge Road between state routes SR-59 and SR-9 to improve safety and emergency access. The project involves paving a 28-foot wide road with two 12-foot travel lanes and shoulders, maintaining a maximum design speed of 35 mph to discourage high-speed traffic. The project includes environmental assessment, drainage improvements, minor safety correcti

Status
Prospective
Sector
Road, Bridge, Government, Waste Processing and Treatment
Location
Virgin, Utah, United States of America
Updated
22 Jul 2026
Source
Citizen Portal AI

ConstructChat

Ask ConstructChat about Sheep Bridge/Key Bridge Road Paving Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sheep Bridge/Key Bridge Road Paving Project” is an infrastructure initiative in the Road sector, located in Virgin, Utah, United States. Taiyo aggregates data on it from Citizen Portal AI.

Participants

Sponsoring Agency

Company

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Washington County plans to pave Sheep Bridge/Key Bridge Road between state routes SR-59 and SR-9 to improve safety and emergency access. The project involves paving a 28-foot wide road with two 12-foot travel lanes and shoulders, maintaining a maximum design speed of 35 mph to discourage high-speed traffic. The project includes environmental assessment, drainage improvements, minor safety corrections, and design accommodations for a future multi-use path and regional trail undercrossings.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Utah

City

Virgin

Source

Source

Citizen Portal AI

URL

More Details

Record type

Project

Sector

Road, Bridge, Government, Waste Processing and Treatment

Article published date

2025-11-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project