Sheikh Mohammed Bin Zayed solar PV plant
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project entails the construction of the 50MW Sheikh Mohammed Bin Zayed solar plant, located in Blitta prefecture, Togo. The project was launched after a Memorandum of Understanding (MoU) signed in March 2019 between the Ministry of Mines and Energies and the sponsor - AMEA Power. AMEA Power will build, own, operate and transfer the solar power plant.
The facility will sell electricity to the
- Status
- Prospective
- Sector
- Commercial, Government, Power Transmission, Residential, Solar, Power Generation (CCGT)
- Location
- Togo
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Sheikh Mohammed Bin Zayed solar PV plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the construction of the 50MW Sheikh Mohammed Bin Zayed solar plant, located in Blitta prefecture, Togo. The project was launched after a Memorandum of Understanding (MoU) signed in March 2019 between the Ministry of Mines and Energies and the sponsor - AMEA Power. AMEA Power will build, own, operate and transfer the solar power plant. The facility will sell electricity to the Togo Electric Power Company (CEET) under a 25-year PPA. The planned power output is split into two phases, with the first phase building out 30MW and the remainder to follow in a second phase. The project has a pretax total cost of XOF21.5 billion (USD36.35 million) and is co-financed by the Abu Dhabi Fund for Development (USD15 million), Amea Power, and West African Development Bank (BOAD) which provides the Togolese Government with a concessional loan of XOF7 billion (USD11.83 million). Sheikh Mohammed Bin Zayed solar plant is the country’s first utility scale renewable energy project developed by an independent power producer and will provide electricity to 600,000 homes and 700 small and medium-sized enterprises (SMEs). https://ameapower.com/amea-power-signs-power-purchase-agreement-and-concession-agreement-for-50mw-solar-power-project-in-togo/ https://www.republicoftogo.com/Toutes-les-rubriques/Societe/L-energie-d-etre-solidaire https://www.afrik21.africa/en/togo-amea-power-starts-construction-work-for-blitta-solar-power-plant/ https://constructionreviewonline.com/2020/02/construction-of-50mw-blitta-solar-power-plant-in-togo-begins/ https://www.pv-magazine.com/2020/02/06/construction-starts-on-50-mw-pv-plant-in-togo/ https://www.boad.org/en/launching-of-the-first-phase-of-the-construction-of-a-30-mw-solar-power-plant-project-at-blitta-in-the-republic-of-togo-cofinanced-by-boad-to-the-tune-xof7-billion/ |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Togo |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Power Transmission, Residential, Solar, Power Generation (CCGT) |
Article published date | 2024-05-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Togo
- Kékéli Efficient Power S.A
- Togo - Kara and Lomé Markets Reconstruction and Traders Support Project (PARMCO)
- Kékéli Efficient Power thermal power
- Togo - Support Project for Youth Employability and Integration in Growth Sectors (PAEIJ-SP)
- Port of Lome
- Togo - CIZO Pilot Project for off-grid rural electrification using solar kits
- Cotecna Inspection S.A. Bureau de Liaison du Togo
- Centrale thermique de Lome
