Shelbina Lake Bridge Replacement REBID
Sector: Water Supply and Storage • Location: Salt River Township, Missouri, United States of America
Source: Dodge USA
Construction of a 75 foot, 5-span steel wide flange beam bridge on existing abutments and piers, approach roadway work, spillway repair work, and any incidental work in accordance with the plans and specifications. The project is located on Golf Course Drive, in Section 20, Township 57 N, Range 10 West, City of Shelbina in Shelby County, Missouri, over Shelbina Lake.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Construction of a 75 foot, 5-span steel wide flange beam bridge on existing abutments and piers, approach roadway work, spillway repair work, and any incidental work in accordance with the plans and specifications. The project is located on Golf Course Drive, in Section 20, Township 57 N, Range 10 West, City of Shelbina in Shelby County, Missouri, over Shelbina Lake. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
