Shenditake 1
One of 40 projects Taiyo tracks in Xinjiang Uygur Autonomous Region.
Source: The Tribune
The Shenditake 1 project, executed by China's state-run CNPC, has successfully drilled the deepest vertical well in Asia, reaching a depth of 10,910 meters in the Taklimakan Desert. This project aims to advance the study of Earth's evolution and deep-Earth geology while also searching for oil and gas resources. It has achieved several engineering breakthroughs, including the deepest liner cementin
- Status
- Closed
- Sector
- Oil and Gas
- Location
- Xinjiang Uygur Autonomous Region, China
- Updated
- 22 Jul 2026
- Source
- The Tribune
ConstructChat
Ask ConstructChat about Shenditake 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Shenditake 1 project, executed by China's state-run CNPC, has successfully drilled the deepest vertical well in Asia, reaching a depth of 10,910 meters in the Taklimakan Desert. This project aims to advance the study of Earth's evolution and deep-Earth geology while also searching for oil and gas resources. It has achieved several engineering breakthroughs, including the deepest liner cementing and fastest onshore drilling. |
Original sector | Energy |
Location
Country | China |
State | Xinjiang Uygur Autonomous Region |
Source
Source | The Tribune |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Oil and Gas projects in China
- Dezhou CoalFired Power Plant
- Jiangsu Xiangshui Offshore Wind Farm
- Shengzhou Municipal Solid Waste Landfill Site Phase II
- Dejiang County Biomass Power Project
- Shantou Topou Power Plant
- Guangdong Liquefied Natural Gas and Trunkline Project, Phase I
- Chuandongbei Project, Sichuan Basin
- Zhejiang Ningbo LNG Terminal, China
