logo

Shenzhen Yeahka C4 Office Design / JSPA Design

Sector: Cement

Source: ArchDaily

Project
Closed

Located on the middle floor, the entrance gathers all the public functions of the program: reception, café, event space, and product exhibition area. It is organized in a long transparent strip, to allow a total visual openness from one side of the building to the other. The geometry of the space is accentuated by a long reception desk sitting in front of the façade and behind which a landscape of

Project Information FAQ

Project Information

3 Q
The project “Shenzhen Yeahka C4 Office Design / JSPA Design” is an infrastructure initiative in the Cement sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Located on the middle floor, the entrance gathers all the public functions of the program: reception, café, event space, and product exhibition area. It is organized in a long transparent strip, to allow a total visual openness from one side of the building to the other. The geometry of the space is accentuated by a long reception desk sitting in front of the façade and behind which a landscape of cactuses filters the view to the outside.Text description provided by the architects.The Yeahka headquarter office project consisted of the refurbishment of three floors of the Kexing Science Park office building inShenzhenfor a total area of 6000 m2. The design process started with the removal of all the superfluous claddings and decorations to come back to the original state of the building structure. The idea was to create openings in the concrete slabs to expand part of the space vertically, bring in more natural light, and connect the three floors.The workstations of the office are organized into small units. Similar glass boxes hosting meeting rooms or managers' private offices are used to partition the working space into comfortable working open spaces. For the materials we choose to use concrete block pavements, a commonly used outdoor public spaces flooring material, to bring it inside the office space. Through design, this very standard material becomes an interesting surface for the interior space. It creates the office’s public spaces floor and even continues vertically on the walls. Its rough finishing emphasized by lighting comes in opposition with very sleek materials such as glass, reglit or stainless steel.The entrance public area is also dilated vertically with a large opening in the ceiling expanding on three structural spans. Five meeting rooms are set up in a cantilever into this void, appearing like glass boxes floating in the reception area. They play with the instability sensation and create a strong spatial experience for the visitor. Workstations are kept invisible from the public but these suspended meeting rooms play the role of a showcase of the work activities going on in the office. It creates an interesting relationship between a visual connection and actual physical distance between the visitor and the office’s staff.The public area is also where a void on the three floors is created to become the main vertical circulation axis of the project. The staircase is conceived as a sculptural element composed of two L-shaped structures overlapping flying from floor to floor with no intermediary support. Its apparent heaviness contrasts with the absence of visible structure and gives a strong aerial feeling.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data