Shepard Lane Interchange Project
One of 10,000+ projects Taiyo tracks in Utah.
Source: ABC4 Utah
Project to build a new interchange at Shepard Lane in Farmington to reduce congestion and enhance safety. The interchange will cross over the Union Pacific Railroad and UTA tracks and improve pedestrian and bike connectivity. The Shepard Lane Bridge was permanently closed in May and is being demolished with overnight closures on I-15. The new interchange is expected to open in late 2026.
- Status
- Under Construction
- Sector
- Rail, Bridge, Road, Government
- Location
- Farmington, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- ABC4 Utah
ConstructChat
Ask ConstructChat about Shepard Lane Interchange Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project to build a new interchange at Shepard Lane in Farmington to reduce congestion and enhance safety. The interchange will cross over the Union Pacific Railroad and UTA tracks and improve pedestrian and bike connectivity. The Shepard Lane Bridge was permanently closed in May and is being demolished with overnight closures on I-15. The new interchange is expected to open in late 2026. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Utah |
City | Farmington |
Source
Source | ABC4 Utah |
URL |
More Details
Record type | Project |
Sector | Rail, Bridge, Road, Government |
Article published date | 2025-06-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
