Shephards Academy Day Care
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
BP-03 Cast-In Place Concrete-Building Foundations & Slabs BP-04 Masonry Bp-05 Structural Steel & Metal Fabrications BP-06 Carpentry/General Trades BP-07.2 Insulation BP-07.5 Roofing BP-08 Glazing BP-08.1 Doors & Hardware BP-09 Flooring & Wall Tile BP-09.7 Painting BP-12 Casework BP-14 Conveying Equipment-Elevator BP-21 Fire Sprinklers BP-22 Plumbing BP-23 HVAC BP-26 Electrical BP-28 Fire Detection
- Status
- Closed
- Sector
- Metal, Steel, Cement, Education, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Car parking, Commercial, Automotive
- Location
- Hanover Park, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Shephards Academy Day Care
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | BP-03 Cast-In Place Concrete-Building Foundations & Slabs BP-04 Masonry Bp-05 Structural Steel & Metal Fabrications BP-06 Carpentry/General Trades BP-07.2 Insulation BP-07.5 Roofing BP-08 Glazing BP-08.1 Doors & Hardware BP-09 Flooring & Wall Tile BP-09.7 Painting BP-12 Casework BP-14 Conveying Equipment-Elevator BP-21 Fire Sprinklers BP-22 Plumbing BP-23 HVAC BP-26 Electrical BP-28 Fire Detection / Alarm BP-31 Site preparation/Excavating/Site Utilities BP-32 Paving BP-32.1 Site concrete, cur... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Hanover Park |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Steel, Cement, Education, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Car parking, Commercial, Automotive |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
