Sheraton New Orleans Hotel Building Renovation
Sector: Water Supply and Storage • Location: New Orleans, Louisiana, United States of America
Source: Dodge
Renovate The Existing Ground Floor Of The Waterbury Building In The Sheraton Hotel Complex On The 500 Block Of Canal. The Work To Be Performed Includes Interior Layout Modifications, New Kitchen, New Interior Finishes. Plumbing, Hvac, And Electrical Work To Be Performed. All Work To Be Done As Per Plans.
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Hotel, Commercial
- Location
- New Orleans, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sheraton New Orleans Hotel Building Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Renovate The Existing Ground Floor Of The Waterbury Building In The Sheraton Hotel Complex On The 500 Block Of Canal. The Work To Be Performed Includes Interior Layout Modifications, New Kitchen, New Interior Finishes. Plumbing, Hvac, And Electrical Work To Be Performed. All Work To Be Done As Per Plans. |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | New Orleans |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Power Generation (CCGT), Hotel, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
