Sherburne County - TH 169/CSAH 4 Interchange
Sector: Road • Location: Elk River, Minnesota, United States of America
Source: Dodge
The work includes the construction of approximately: 1 Lump Sum Geotechnical Monitoring System; 1 Lump Sum Building Removal; 93144 Sq Yd Remove Bituminous Pavement; 162738 Cu Yd Excavation-Common; 52472 Cu Yd Excavation-Muck; 21117 Cu Yd Excavation-Channel and Pond; 34137 Cu Yd Granular Embankment CV; 61305 Cu Yd Select Granular Embankment CV; 51469 Cu Yd Select Granular Embankment Super Sand CV;
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The work includes the construction of approximately: 1 Lump Sum Geotechnical Monitoring System; 1 Lump Sum Building Removal; 93144 Sq Yd Remove Bituminous Pavement; 162738 Cu Yd Excavation-Common; 52472 Cu Yd Excavation-Muck; 21117 Cu Yd Excavation-Channel and Pond; 34137 Cu Yd Granular Embankment CV; 61305 Cu Yd Select Granular Embankment CV; 51469 Cu Yd Select Granular Embankment Super Sand CV; 124196 Cu Yd Common Embankment CV; 6689 Sq Yd Column Supported Emban |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in United States of America
- Bothell Everett Highway Overlay Project
- 102nd Ave NE Downtown Access Improvements
- Beardslee Blvd Widening
- 228th St SE Overlay (2nd Ave SE to 9th Ave SE) Project
- 2023 Citywide Pedestrian Safety Improvements Project
- NE 188th St Non-Motorized Improvements
- 2019-ADA Curb Ramps
- NE 185th St Utility Improvements Project
