Sheridan Memorial Hospital Pharmacy and Pediatric Units
Construction documents · Wyoming · Last reported Apr 2024
Source: Dodge USA
The projects begin a four-step construction process moving hospital services to new locations within existing buildings to make room for the EmPATH and crisis stabilization unit. Plans to move the pharmacy department from its current location into the basement of the hospital, The pediatric unit will move to where the pharmacy currently exists. The south side of the medical surgical unit will fill
- Status
- Closed
- Sector
- Commercial, Hospital, Hotel
- Location
- Sheridan, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sheridan Memorial Hospital Pharmacy and Pediatric Units
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The projects begin a four-step construction process moving hospital services to new locations within existing buildings to make room for the EmPATH and crisis stabilization unit. Plans to move the pharmacy department from its current location into the basement of the hospital, The pediatric unit will move to where the pharmacy currently exists. The south side of the medical surgical unit will fill the former pediatric space, and the behavioral health unit will occupy the former med surg south... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Sheridan |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Hospital, Hotel |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
