Sheriff Huber Center Jail Pod Replacement
Sector: Commercial • Location: Eau Claire, Wisconsin, United States of America
Source: Dodge USA
The proposed project is for both the planning, design, and engineering phase and the construction phase to replace the downtown jail pod. The preliminary project cost is estimated to be $16,900,000, however, this will change based on the architectural plan. The project includes demolishing the existing downtown jail pod, replacing it with a day court holding rooms for inmates, and building a new j
- Status
- Prospective
- Sector
- Commercial, Government, Manufacturing (Industrial)
- Location
- Eau Claire, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sheriff Huber Center Jail Pod Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project is for both the planning, design, and engineering phase and the construction phase to replace the downtown jail pod. The preliminary project cost is estimated to be $16,900,000, however, this will change based on the architectural plan. The project includes demolishing the existing downtown jail pod, replacing it with a day court holding rooms for inmates, and building a new jail POD at the County s correctional facility on the eastside of Green Bay. The project will be i... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Eau Claire |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
