logo
ProjectClosed

Sheriffs Office Remodel

Closed · Indiana · Last reported Nov 2024

Source: Dodge USA

Scope of Work includes modifications of approximately 2,772 square feet offormer office spaces, hallways, kitchen, restroom and training room into newoffices, waiting area, reception areas, conference room, restroom and Sheriffsoffice suite with closet. Work involves construction of gypsum partition walls, new and refinished doors, frames and door hardware, flooring, suspendedceilings, painting, e

Status
Closed
Sector
Government, Manufacturing (Industrial), Residential, Rail, Commercial, Power Generation (CCGT)
Location
Crown Point, Indiana, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Sheriffs Office Remodel

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sheriffs Office Remodel” is an infrastructure initiative in the Government sector, located in Crown Point, Indiana, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Scope of Work includes modifications of approximately 2,772 square feet offormer office spaces, hallways, kitchen, restroom and training room into newoffices, waiting area, reception areas, conference room, restroom and Sheriffsoffice suite with closet. Work involves construction of gypsum partition walls, new and refinished doors, frames and door hardware, flooring, suspendedceilings, painting, electrical power, lighting, data, fire alarm modifications,fire suppression modifications, HVAC VA...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Indiana

City

Crown Point

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Manufacturing (Industrial), Residential, Rail, Commercial, Power Generation (CCGT)

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project