Sherman Avenue Sidewalk Replacement
Sector: Cement • Location: Niles, Ohio, United States of America
Source: Dodge USA
The work to be performed on this project generally consists of the removal of 3,750 square feet of existing sidewalk and 40 linear feet of existing curb. 3,550 square feet of 4 concrete walk, 500 square feet of 6 concrete walk, and 115 square feet of curb ramp will be installed. All walk and curb ramp installation must be ADA compliant. Miscellaneous and incidental repairs such as installation of
- Status
- Closed
- Sector
- Cement, Car parking, Automotive, Government, Commercial
- Location
- Niles, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sherman Avenue Sidewalk Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed on this project generally consists of the removal of 3,750 square feet of existing sidewalk and 40 linear feet of existing curb. 3,550 square feet of 4 concrete walk, 500 square feet of 6 concrete walk, and 115 square feet of curb ramp will be installed. All walk and curb ramp installation must be ADA compliant. Miscellaneous and incidental repairs such as installation of new curb, linear grading, seeding & mulching, tree & stump removal, and drive replacement are par... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Niles |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Automotive, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
