logo

Shiawassee NWR Hydrologic Reconnection and Wetland Restoration Phase II

Sector: Power Transmission • Location: United States of America

Source: Grants.gov

Project
Archived

This is a notice of intent to award single source cooperative agreement to Ducks Unlimited without competition under justification 505DM 2.14.B.2 and 4 in the approximate amount of $213,592.00. The Service will be substantially involved under this funding opportunity. Competition for these awards is not practical as this is a continuation of an existing project. During phase 1 of this restoratio

Project Information FAQ

Project Information

5 Q
The project “Shiawassee NWR Hydrologic Reconnection and Wetland Restoration Phase II” is an infrastructure initiative in the Power Transmission sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

archived

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This is a notice of intent to award single source cooperative agreement to Ducks Unlimited without competition under justification 505DM 2.14.B.2 and 4 in the approximate amount of $213,592.00. The Service will be substantially involved under this funding opportunity. Competition for these awards is not practical as this is a continuation of an existing project. During phase 1 of this restoration project a portion of future phases of work have been surveyed, engineered, and designed (including a new dike, barrier protection islands within Maankiki marsh, and removal of an existing dike). These funds will be utilized to complete phase II surveying, design, and engineering work associated with this hydrologic reconnection and wetland restoration project. Ducks Unlimited will provide technical guidance as FWS implements the unfinished portions of phase 1. Ducks Unlimited is uniquely qualified to conduct this project because they surveyed, engineered, and designed phase 1 of this restoration plan. They are intimately familiar with site specific conditions (e.g., soils, complex hydrology, local/state/federal regulations to complete a project of this scale), which will result in cost savings for phase II. Engineering/design concepts and plans from phase 1 will be utilized and implemented in phase II restoration planning and design, the information and plans from phase 1 are essential components of the successful completion of phase II.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data