Shilshole Bay Marina X-Dock Rehabilitation
Closed · Washington · Last reported Aug 2024
Source: Dodge USA
The project's scope aims to remove the 20 creosote-treated timber piles currently supporting the fixed pier and replace them with 13 steel piles. Creosote has been historically used as a treatment. to preserve timber in marine environments. This proj-ect is designed to replace the piles and retain the existing super-structure under the Port's Pile Systems Repair & Maintenance Programmatic permit.
- Status
- Closed
- Sector
- Forest Products and Packaging, Steel, Seaport, Government, Metal, Commercial, Manufacturing (Industrial)
- Location
- Seattle, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Shilshole Bay Marina X-Dock Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project's scope aims to remove the 20 creosote-treated timber piles currently supporting the fixed pier and replace them with 13 steel piles. Creosote has been historically used as a treatment. to preserve timber in marine environments. This proj-ect is designed to replace the piles and retain the existing super-structure under the Port's Pile Systems Repair & Maintenance Programmatic permit. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Steel, Seaport, Government, Metal, Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in United States of America
- CS 572/OAK STREET FROM REYNOLDS STREET TO BURNS STREET - TIA
- CR 29/OLD WEST POINT ROAD @ CHATTAHOOCHEE RIVER TRIB
- BUILDING PAPER, SIDING TRIM, DECK COATING INSTALL NEW GSM FL ASHING AT TRELLIS TOP BEAM, SHARES PLANS W/202202613
- BUILDING PAPER, SIDING TRIM, DECK COATING INSTALL NEW GSM FL ASHING AT TRELLIS TOP BEAM, SHARES PLANS W/202202614
- GLENWOOD-LUMBER CITY ROAD
- CALHOUN STREET FROM JONES STREET TO S OF JONES STREET - TIA
- JOHNSON STREET IN LUMBER CITY - TIA
- HELEN STREET IN LUMBER CITY
