Ship Rehabilitation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
- The glass block window is not part of the count of windows to be changed. 2. Kitchen window Match size of existing window opening to maintain the existing shelf. Window must be impact resistant window and meet required code.
- Status
- Closed
- Sector
- Government, Manufacturing (Industrial), Commercial, Seaport, Residential
- Location
- Merritt Island, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Ship Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. The glass block window is not part of the count of windows to be changed. 2. Kitchen window Match size of existing window opening to maintain the existing shelf. Window must be impact resistant window and meet required code. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Merritt Island |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Manufacturing (Industrial), Commercial, Seaport, Residential |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
