logo
ProjectClosed

SHIP WASTE DISPOSAL

Closed · China

Source: World Bank Group

The objectives of the project are to reduce pollution of international and Chinese territorial waters caused by ship's wastes through: a) improved monitoring and analysis of the nature and magnitude of the problem; b) improved policy, regulatory, and incentive frameworks; and c) the provision of infrastructure to receive and safely dispose of ship wastes. The project consists of two components: a

Status
Closed
Sector
Water Supply and Storage, Oil and Gas, Seaport, Waste Processing and Treatment, Government
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about SHIP WASTE DISPOSAL

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SHIP WASTE DISPOSAL” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objectives of the project are to reduce pollution of international and Chinese territorial waters caused by ship's wastes through: a) improved monitoring and analysis of the nature and magnitude of the problem; b) improved policy, regulatory, and incentive frameworks; and c) the provision of infrastructure to receive and safely dispose of ship wastes. The project consists of two components: a national component and a ports component. The national component will: 1) establish baseline data on international ship traffic, related waste types and quantities through a pilot interport ship waste monitoring system (SEATRACK); 2) prepare a comprehensive accident (oil pollution) contingency plan for each port; 3) initiate a Large Marine Ecosystem (LME) monitoring program for the Yellow Sea; 4) undertake a study of the treatment of chemically contaminated water; 5) upgrade environmental monitoring capabilities at the ports, coastal waters and international waters; and 6) provide consultant's services and training. The port's component will: i) define, design, and provide land-based collection and disposal facilities at the ports of Dalian, Tianjin, Shanghai, Ningbo, Xiamen and Guangzhou; and ii) upgrade environmental monitoring and enforcement capabilities of each of the port authorities.

Original sector

FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Oil and Gas, Seaport, Waste Processing and Treatment, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project