logo
ProjectProject Awarded

Shiyan Utility Tunnel PPP project

One of 10,000+ projects Taiyo tracks in China.

Source: InfraPPPWorld

The project is located in Shiyan, one of the first pilot cities to build utility tunnels in China. Works on the project will cover the construction of new utility tunnels of 51.5km and two control centers. The tunnels will carry utility lines such as electricity, water and sewer pipes. The contract has a total value estimated at RMB3.55 billion (US$544.6 million).

Status
Closed
Sector
Water Supply and Storage, Tunnel, Telecommunications, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Waste Processing and Treatment
Location
China
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Shiyan Utility Tunnel PPP project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Shiyan Utility Tunnel PPP project” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Company

Status

Original status

project awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is located in Shiyan, one of the first pilot cities to build utility tunnels in China. Works on the project will cover the construction of new utility tunnels of 51.5km and two control centers. The tunnels will carry utility lines such as electricity, water and sewer pipes. The contract has a total value estimated at RMB3.55 billion (US$544.6 million).

Original sector

Energy, Transport, Social & Health, Water & Waste, Telecom & I.C.T., Industrial

Procurement method

Location

Country

China

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Tunnel, Telecommunications, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Waste Processing and Treatment

Article published date

2025-03-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project