logo

Shoaiba power and water plant expansion in Saudi Arabia

Sector: Government • Location: Saudi Arabia

Source: InfraPPPWorld

Project
Project Partially Completed

The Project was requested by the Government to be developed on an urgent basis to add 150,000 m3/d net water desalination capacity.  SAMAWEC, the successful bidder for the Shuaibah IWPP, was invited to submit a proposal to develop the Project broadly under the same economics and contractual arrangements as the Shuaibah IWPP. The Project is located on a reclaimed land south of Shuaibah III IWPP. 10

Project Information FAQ

Project Information

5 Q
The project “Shoaiba power and water plant expansion in Saudi Arabia” is an infrastructure initiative in the Government sector, located in Saudi Arabia. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project partially completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project was requested by the Government to be developed on an urgent basis to add 150,000 m3/d net water desalination capacity.  SAMAWEC, the successful bidder for the Shuaibah IWPP, was invited to submit a proposal to develop the Project broadly under the same economics and contractual arrangements as the Shuaibah IWPP. The Project is located on a reclaimed land south of Shuaibah III IWPP. 10 trains based on Reverse Osmosis (RO) Desalination Technology. The Project is currently on full production.  Owned by SAMAWEC (60 %), PIF (32 %) & SEC (8 %). SAMAWEC is owned 30 % by ACWA Power & remaining 30 % by Malaysian consortium (Tenaga Nasional Berhard, Malakoff Berhard & Khazanah Nasional Berhard) Over the life of the Project, the Plant will have an average availability of 96%. Under the PWPA no planned outages are allowed during the summer period or the Hajj period, since the water and power demand during these periods is the highest.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data