Shoalhaven Pumped Hydro Expansion Feasibility Study
Sector: Commercial • Location: Australia
Source: Australian Renewable Energy Agency (ARENA)
The Shoalhaven Pumped Hydro Energy Storage (PHES) feasibility study will explore the technical and commercial feasibility of expanding the existing Shoalhaven PHES Scheme.How the project worksThe Shoalhaven Pumped Hydro Expansion Feasibility Study scheme will be approached by Origin Energy in two stages:Stage 1 (completed) identified a preferred option for expanding the schemeStage 2 is funded by
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Shoalhaven Pumped Hydro Energy Storage (PHES) feasibility study will explore the technical and commercial feasibility of expanding the existing Shoalhaven PHES Scheme.How the project worksThe Shoalhaven Pumped Hydro Expansion Feasibility Study scheme will be approached by Origin Energy in two stages:Stage 1 (completed) identified a preferred option for expanding the schemeStage 2 is funded by ARENA and will explore the technical and commercial feasibility of the preferred option, which will include determining the final design and capital costs and may lead to a final investment decision.Area of innovationAs the economy decarbonises and as baseload coal generation retires, more intermittent energy generation (such as wind and solar) will enter the market. This creates the need for increased sources of dispatchable energy generation such as pumped hydro, as well as the need for large-scale energy storage. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
