logo
ProjectPlanned

Shore Acres Flood Mitigation Project

The owner, status and timeline of this project. A free account opens every field.

Source: St Pete Rising

The Shore Acres Flood Mitigation Project is a major infrastructure effort aimed at reducing severe flooding in the Shore Acres neighborhood of St. Petersburg. The project involves upgrading stormwater infrastructure along approximately 10 miles of roadway, including upsized pipes, new stormwater pump stations, box culverts, and raised roadway segments and intersections. A key feature is a new unde

Status
Prospective
Sector
Residential, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage, Government
Location
St. Petersburg, Florida, United States of America
Updated
22 Jul 2026
Source
St Pete Rising

ConstructChat

Ask ConstructChat about Shore Acres Flood Mitigation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Shore Acres Flood Mitigation Project” is an infrastructure initiative in the Residential sector, located in St. Petersburg, Florida, United States. Taiyo aggregates data on it from St Pete Rising.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Shore Acres Flood Mitigation Project is a major infrastructure effort aimed at reducing severe flooding in the Shore Acres neighborhood of St. Petersburg. The project involves upgrading stormwater infrastructure along approximately 10 miles of roadway, including upsized pipes, new stormwater pump stations, box culverts, and raised roadway segments and intersections. A key feature is a new underground stormwater pump station with multiple large pumps and emergency backup power to ensure operation during outages. The project addresses flooding caused by storm surge, high tides, and heavy rainfall by implementing a pumped stormwater system to improve drainage.

Original sector

Urban Development

Budget

Location

Country

United States of America (USA)

State

Florida

City

St. Petersburg

Source

Source

St Pete Rising

URL

More Details

Record type

Project

Sector

Residential, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage, Government

Article published date

2025-12-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project