Shore Road - Western Head Resiliency

Sector: Road • Location: Nova Scotia, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The project is along Shore Road and consists of two segments. The first segment is approximately 320 metres in length. The start point is roughly 200 metres east of the intersection of Shore Road and Sand Beach Road. The end point is 300 metres east of the start point along Shore Road. The work will take place along the beach in-between Shore Road and the Atlantic Ocean. The second segment is roug

Status
Prospective
Sector
Road, Government
Location
Nova Scotia, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Shore Road - Western Head Resiliency

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Shore Road - Western Head Resiliency” is an infrastructure initiative in the Road sector, located in Nova Scotia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project is along Shore Road and consists of two segments. The first segment is approximately 320 metres in length. The start point is roughly 200 metres east of the intersection of Shore Road and Sand Beach Road. The end point is 300 metres east of the start point along Shore Road. The work will take place along the beach in-between Shore Road and the Atlantic Ocean. The second segment is roughly 160 metres in length and begins approximately 2.4 kilometres east of the intersection. The end point is roughly 160 metres eastward from the start point. The work will also take place along the beach in-between Shore Road and the Atlantic Ocean. The work is required to protect two segments of Shore Road that run along the Atlantic Coast, which are susceptible to shoreline erosion and flooding issues. There is an existing retaining wall in the first segment that protects the road, however, R1 Armour Rock is required in-front of the wall to help reinforce it and protect it during storm events. The second segment is currently unprotected, and erosion has already begun. The project involves excavation of the existing rock and gravel that is washed up against the retaining wall and reinstating this area with armour rock (>1000mm diametre) for the first segment and placing armour rock for the second segment. The work will result in added protection to the road which will be more resistant to shoreline erosion due to the effects of climate change such as sea level rise and more severe storm events. In-addition this will help address on-going flooding issues.

Original sector

Climate Resilience

Location

Country

Canada

State

Nova Scotia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Road, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project