In 1998, Shoreline Power signed a 10-year concession agreement with the Tonga Electric Power Board (the state-owned utility) to take over Tonga’s electricity generation, transmission and distribution system. Shoreline intended to upgrade and replace aging equipment, and to invest a total of 13 million pa’anga (US$6.5 million), but was not required to pay Tonga Electric Power to lease the assets.

Project Information FAQ

Project Information

4 Q
The project “Shoreline Power” is an infrastructure initiative in the Power Transmission sector, located in Tonga. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 1998, Shoreline Power signed a 10-year concession agreement with the Tonga Electric Power Board (the state-owned utility) to take over Tonga’s electricity generation, transmission and distribution system. Shoreline intended to upgrade and replace aging equipment, and to invest a total of 13 million pa’anga (US$6.5 million), but was not required to pay Tonga Electric Power to lease the assets. In September 2000, Shoreline took over generation and transmission in the Vava’u island group, and in February 2002, the company took over distribution and transmission in Tongatapu and also took over generation, distribution generation, transmission and distribution in Ha’apai and ‘Eua. By 2004, Shoreline was the sole supplier of electricity in Tonga. Shoreline Power was a subsidiary of the Shoreline Group, which in turn was owned Crown Prince Tupouto’a, along with two business partners. Shoreline owned and operated diesel generators, as well as distribution and transmission systems. By July 2004, Shoreline had purchased two new generators at a cost of 8 million pa’anga (US$4 million), increasing total capacity from 8.3 MW to 12.7 MW. In February 2005 Shoreline installed a new 3 MW generator, at a cost of roughly 6 million pa’anga (US$3 million), and had recently commissioned a new 1.4 MW generator at a cost of 1.5 million pa’anga (US$750,000). In May 2005, Shoreline offered to sell its assets back to the government after public protests calling for a return to government ownership. In July 2008, Tonga’s parliament approved over US$ 12 million to purchase the power company Shoreline from the King.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data