logo
ProjectArchived

Shoreline Stabilization, NSA Annapolis, MD

Sector: Aerospace & Defense • Location: United States of America

Source: Grants.gov

The purpose of the Agreement is to design and obtain permitting for shoreline stabilization measures at Reach E, E1, G, and P, and to construct shoreline stabilization measures for approximately 115 linear feet of Reach E1 that will provide structural repair and erosion prevention measures at NSA Annapolis Carr Creek. Options for the construction of Reach E, G and Reach P may be exercised at the d

Status
Closed
Sector
Aerospace & Defense, Government, Manufacturing (Industrial)
Location
United States of America
Updated
22 Jul 2026
Source
Grants.gov

ConstructChat

Ask ConstructChat about Shoreline Stabilization, NSA Annapolis, MD

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Shoreline Stabilization, NSA Annapolis, MD” is an infrastructure initiative in the Aerospace & Defense sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Participants

Sponsoring Agency

Status

Original status

archived

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The purpose of the Agreement is to design and obtain permitting for shoreline stabilization measures at Reach E, E1, G, and P, and to construct shoreline stabilization measures for approximately 115 linear feet of Reach E1 that will provide structural repair and erosion prevention measures at NSA Annapolis Carr Creek. Options for the construction of Reach E, G and Reach P may be exercised at the discretion of the Navy. This will include a wetland verification/delineation on Greenbury Point. The wetland delineation shall consist of a review and verification of mapped wetlands on Greenbury Point with a walk through to identify any changes in wetland characteristics. The shoreline work shall include all necessary measures to meet the intent of the restoration and stabilization efforts to reduce erosion, and to restore riparian habitat. These measures will include installing shoreline erosion control measures with native species plantings. Specifically, the work shall enforce the structural stability along the indicated shoreline. In addition, the Cooperator shall obtain the necessary Federal, local, and State permits to facilitate the implementation of log sill, rock sill, log toe and marsh creation options to provide for structural integrity of the specified shoreline at NSA Annapolis Carr Creek. An EA was completed for the entire proposed 28,000 linear feet of stabilization in August of 2015 and a supplemental report the Carr Creek Shoreline Survey and Riparian Habitat Restoration Design Report was completed in 2013. A wetland Jurisdictional Determination for Greenbury Point was last conducted in 2013.

Location

Country

United States of America (USA)

Source

Source reliability

High

Source

Grants.gov

URL

More Details

Record type

Project

Sector

Aerospace & Defense, Government, Manufacturing (Industrial)

Article published date

2023-06-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project