Shoreline Stabilization, NSA Annapolis, MD
Sector: Aerospace & Defense • Location: United States of America
Source: Grants.gov
The purpose of the Agreement is to design and obtain permitting for shoreline stabilization measures at Reach E, E1, G, and P, and to construct shoreline stabilization measures for approximately 115 linear feet of Reach E1 that will provide structural repair and erosion prevention measures at NSA Annapolis Carr Creek. Options for the construction of Reach E, G and Reach P may be exercised at the d
- Status
- Closed
- Sector
- Aerospace & Defense, Government, Manufacturing (Industrial)
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Grants.gov
ConstructChat
Ask ConstructChat about Shoreline Stabilization, NSA Annapolis, MD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | archived |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of the Agreement is to design and obtain permitting for shoreline stabilization measures at Reach E, E1, G, and P, and to construct shoreline stabilization measures for approximately 115 linear feet of Reach E1 that will provide structural repair and erosion prevention measures at NSA Annapolis Carr Creek. Options for the construction of Reach E, G and Reach P may be exercised at the discretion of the Navy. This will include a wetland verification/delineation on Greenbury Point. The wetland delineation shall consist of a review and verification of mapped wetlands on Greenbury Point with a walk through to identify any changes in wetland characteristics. The shoreline work shall include all necessary measures to meet the intent of the restoration and stabilization efforts to reduce erosion, and to restore riparian habitat. These measures will include installing shoreline erosion control measures with native species plantings. Specifically, the work shall enforce the structural stability along the indicated shoreline. In addition, the Cooperator shall obtain the necessary Federal, local, and State permits to facilitate the implementation of log sill, rock sill, log toe and marsh creation options to provide for structural integrity of the specified shoreline at NSA Annapolis Carr Creek. An EA was completed for the entire proposed 28,000 linear feet of stabilization in August of 2015 and a supplemental report the Carr Creek Shoreline Survey and Riparian Habitat Restoration Design Report was completed in 2013. A wetland Jurisdictional Determination for Greenbury Point was last conducted in 2013. |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Grants.gov |
URL |
More Details
Record type | Project |
Sector | Aerospace & Defense, Government, Manufacturing (Industrial) |
Article published date | 2023-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Aerospace & Defense projects in United States of America
- SAT Terminal B
- Southwest Airlines BWI New Tech Ops Hangar East
- SFO United Airlines Terminal 3 Ticket Counter Redesign and Break Room Refresh
- TPA Parking Garage & Administration Building
- MDW Terminal & Concourse
- Seattle-Tacoma International Airport (SEA) International Arrivals Facility
- LAX Tom Bradley International Terminal Renovation, Apron, & Concourse Demolition
- SJC North Concourse
