logo

Shoshone Drainage; Replace and enhance culvert systems

Sector: Cement • Location: CA, United States of America

Source: US Department of Transportation (USDOT)

Project
Close

Other Agencies with Actions or Authorizations: California Department of the Interior, Fish and Wildlife Service Description: The California Department of Transportation (Department), as assigned by the Federal Highway Administration (FHWA), is the lead agency under the National Environmental Policy Act (NEPA). The Department is the lead agency under the California Environmental Quality Act (CEQA).

Project Information FAQ

Project Information

5 Q
The project “Shoshone Drainage; Replace and enhance culvert systems” is an infrastructure initiative in the Cement sector, located in CA, United States of America. Taiyo aggregates data on it from US Department of Transportation (USDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Other Agencies with Actions or Authorizations: California Department of the Interior, Fish and Wildlife Service Description: The California Department of Transportation (Department), as assigned by the Federal Highway Administration (FHWA), is the lead agency under the National Environmental Policy Act (NEPA). The Department is the lead agency under the California Environmental Quality Act (CEQA). The existing culvert system at State Route (SR) 178, post mile 43.4, in Inyo County, CA (Figure 1) contains two separate drainage systems (OS 1 and OS 2) to accommodate the two main drainage paths within the Amargosa River channel. The westernmost culvert (DS1) is located at PM 43.39, and the eastern culvert location (OS2) is located at PM 43.44 (Figures 2-4). A survey of the existing culverts has determined that the culverts have exceeded their recommended 25 year design service lives, and due to sediments deposited by the river are only operating at 25%-50% of their original capacity. This project proposes to replace both sets of culverts (OS1 and DS2) with pre-cast concrete box culverts to increase hydraulic capacity and reduce the frequency of water overtopping the highway.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data