Shoshone Field Office Replacement REBID
One of 10,000+ projects Taiyo tracks in Idaho.
Source: Dodge
The subject requirement consists of all labor, materials, equipment, and supervision to construction of the new building, including structure and foundation, layout and installation of systems and equipment, electrical and grounding, water system, plumbing and waste piping, HVAC, building demolition, construction of site features including curb and gutter, sidewalks and slabs, concrete pavement, d
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Power Generation (CCGT), Commercial, Car parking, Power Transmission, Manufacturing (Industrial), Automotive, Residential, Cement, Waste Processing and Treatment
- Location
- Shoshone, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Shoshone Field Office Replacement REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The subject requirement consists of all labor, materials, equipment, and supervision to construction of the new building, including structure and foundation, layout and installation of systems and equipment, electrical and grounding, water system, plumbing and waste piping, HVAC, building demolition, construction of site features including curb and gutter, sidewalks and slabs, concrete pavement, drainage system, site utilities, site demolition, and other required site elements located at Shos... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Shoshone |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Power Generation (CCGT), Commercial, Car parking, Power Transmission, Manufacturing (Industrial), Automotive, Residential, Cement, Waste Processing and Treatment |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
