Shouguang Waste-to-energy Plant Phase II
Active · China
Source: World Bank Group
The project involves the construction of phase II of Shouguang Waste-to-energy plant, located in Shandong Province of China. Phase II of the project has a designed daily waste processing capacity of 400 tonnes (146,000 tonnes/year) and will be equipped with one 400 tonnes/day mechanic grate furnaces and one 9 MW steam turbine power generator. Phase II is expected to generate approximately 40 milli
- Status
- Prospective
- Sector
- Government, Waste Processing and Treatment, Biomass, Wind, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Shouguang Waste-to-energy Plant Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of phase II of Shouguang Waste-to-energy plant, located in Shandong Province of China. Phase II of the project has a designed daily waste processing capacity of 400 tonnes (146,000 tonnes/year) and will be equipped with one 400 tonnes/day mechanic grate furnaces and one 9 MW steam turbine power generator. Phase II is expected to generate approximately 40 million kWh of green electricity per year. Upon Phase II completion, the total designed daily waste processing capacity of the whole plant will reach 1,000 tonnes, which will generate on-grid electricity up to 120 million kWh annually. The sponsor is China Everbright International Ltd. The project cost is approximately CNY 240 million or $ 34 million. Financial close was reached on 26 November 2019. https://www.ebchinaintl.com/en/media/news_content-p191126.html |
Original sector | Municipal Solid Waste |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Government, Waste Processing and Treatment, Biomass, Wind, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2024-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
